Air-Cooled Hot Oil Pump Oil Transfer Pump Hydraulic Pump Fuel Pump Stainless Steel Pump

Air-Cooled Hot  Oil Pump  Oil Transfer Pump  Hydraulic Pump Fuel Pump Stainless Steel Pump

Our Rewards:

Higher top quality !———–   Reduce the later on servicing trouble !
Realistic value! —-  Use expense-effective pump, preserve income.
Good services! ———– Reply Timely , Sufficient supply, Shipping time short 
Any queries can examine with us at time. Attempt our ideal to assist you. Not only pumps, other merchandise also can assist you discover what you need to have.

Short Introduction:

RY type sizzling oil pump adopts the self-warmth-radiating framework, alter the standard water cooling framework, make it far more simple, tiny quantity, financial system operation cost, good overall performance, reliable procedure, it is the CZPT era item based on our nation digesting and absorbing overseas technologies.

Structure Qualities:

one. Standard construction is one phase single suction cantilever feet assistance, pump suction is axial inhaled, discharge centre vertical, and installed in a exact same base with motor.

two. Pump supported by double ball bearing, front end lubricated by lubricating oil, back again conclude lubricated by grease, a guide tubing in the center, to notice the problems of sealing at any time and restoration of warmth conduction oil.

three. Sizzling oil pump shaft seal
(one) With the blend of packing seal and mechanical seal, packing seal use substantial temperature resistant packing, has the excellent thermal adaptability, while mechanical seal adopts higher mechanical power and wear resistance, excellent difficult alloy material, which assures the sealing functionality underneath substantial temperature situations.
(2) Adopts imported polyethylene (PTFE) as lip condition seal, make the sealing performance significantly much better, seal dependability of twenty five moments than rubber seal, and with extremely sturdy corrosion-resist ability.

Application:

one. oil and chemical industry
two.  the oil market
three. synthetic fiber market
4. textile printing and dyeing business
5. plastic and rubber sector
6. paper-making market,
seven. wooden business
eight. the building market
nine. In addition, RY sequence of heat conduction oil pump in mechanical sector, foods market,           pharmaceutical manufacturing, very hot oil furnace oil circulation technique, very hot oil heating cycle is widely utilised in the technique.RY heat conduction oil pump suitable for:

Parameters: 
 

      Model Ability
(m 3 /h)
Head
(m)
Pace
(r/min)
Electrical power (KW) Eff.
n%
NPSH
(m)
Shaft Motor
26-twenty-one hundred four.five fifteen 2825 .forty five .75 forty .eight
50-32-a hundred and fifty 8 22 2840 one. 1.5 forty two 1.six
fifty-32-one hundred sixty 10 25 2840 1.five two.2 42 one.8
65-40-a hundred and sixty twelve.five 25 2880 2.5 three 45 two.2
fifty-50-a hundred and seventy twelve.five 32 2890 three.2 four forty five two.five
50-fifty-150 24 eighteen 2890 3.1 four 46 one.8
sixty five-40-one hundred ninety eighteen 40 2890 four.five five.5 52 two.8
65-fifty-one hundred eighty 32 32 2900 4.5 5.5 fifty two two.7
sixty five-fifty-170 40 25 2900 four.five five.5 52 2.7
sixty five-fifty-a hundred and fifty fifty two 16 2900 4.two 5.five fifty two two.8
sixty five-40-200 25 fifty 2900 6.7 seven.five sixty three 3.1
80-fifty-180 forty forty 2900 six.seven 7.five sixty three 3.1
80-fifty-one hundred seventy sixty twenty 2900 6.7 seven.5 sixty three 3.one
one hundred-sixty five-190 sixty 38 2930 9.two 11 68 three.5
100-65-two hundred 80 forty 2930 12.five fifteen 70 three.5
100-sixty five-220 fifty eight 50 2930 twelve.5 15 68 three.5
100-sixty five-210 90 45 2930 fifteen.seven 18.five 70 three.6
a hundred-sixty five-230 fifty eight sixty 2930 fifteen.5 eighteen.five sixty two three.5
100-sixty five-230 a hundred 55 2940 19.five 22 70 3.6
one hundred twenty five-100-190 155 thirty 2930 17.six 22 seventy two 3.8
one hundred-65-240 a hundred 70 2950 twenty five.5 30 sixty nine.8 four.one
a hundred-65-257 100 80 2950 32.five 37 67 three.six
125-100-220 a hundred and sixty 45 2950 25.five 37 75 3.six
125-eighty-250 a hundred and sixty 60 2970 35.5 45 seventy four 5
a hundred twenty five-eighty-270 a hundred and fifty eighty five 2970 46 55 seventy three five
125-100-250 two hundred sixty 2970 42.eight fifty five seventy six.eight 6
one hundred twenty five-one hundred-257 260 70 2970 sixty four.3 75 77 six.8
one hundred twenty five-a hundred-265 two hundred eighty 2970 59 75 seventy four six
a hundred twenty five-one hundred-245 three hundred fifty five 2970 sixty one 75 74 7.five
125-one hundred-260 300 70 2970 75.3 ninety 78.two 8
one hundred twenty five-one hundred-270 220 eighty five 2970 sixty eight ninety 76 6
one hundred twenty five-one hundred-280 260 eighty five 2970 seventy five 90 seventy six 6.8
a hundred and fifty-one hundred twenty five-250 350 60 2970 seventy five.2 90 76 eight.6
one hundred fifty-a hundred twenty five-240 400 fifty 2970 72 90 seventy six 9.8
one hundred fifty-a hundred twenty five-270 340 seventy six 2970 89.5 a hundred and ten 78.6 8.five
a hundred and fifty-125-250 400 60 2970 88 one hundred ten seventy four 9.eight
150-125-280 400 seventy eight 2970 106 132 eighty.6 nine.8
150-one hundred twenty five-280 370 eighty five 2970 106 132 eighty nine.7
250-200-500 500 80 1480 136 160 seventy six 5
three hundred-250-five hundred 600 80 1480 158 185 70 9
250-two hundred-550 700 eighty 1480 190 220 81 fourteen

FAQ: 
1. What is your payment phrases?
    Typically 30% TT in progress,  we will send you photographs when complete the manufacturing,  balance 70%          must be compensated prior to shipping and delivery. 
    If the whole sum is small, and delivery time is limited or have inventory,  had far better pay out 100% TT when, it      will decrease the treatment fee and straightforward to procedure.

two. What is the shipping conditions?
    EXW, FOB, CFR, CIF, you could decide on any one particular which is handy for you.

3. How about the supply time? 
    Generally it requires 7-ten operating days following your advance payment arrive. The precise supply time                 depends on the objects and the quantity of your get.

four. Do you examination all the goods prior to shipping? 
   Of training course, we have 100% analyzed ahead of shipping and delivery.

5.Could you source sample?
   We are glad to ship sample for your tests, but the value should be paid out by consumers.

six. Can you generate according to customer’s sample and drawing?
    No difficulty, it CZPT according to customer’s request, we provide OEM services if amount is excellent.

7.What is the guarantee time?
   Our warranty time is 1 year typically. 

eight. Can we visit your firm?
    welcome to come to China and visit our company, remember to kindly advise us before your go to, many thanks
 

Air-Cooled Hot  Oil Pump  Oil Transfer Pump  Hydraulic Pump Fuel Pump Stainless Steel Pump