XCMG Hbds80 83m3 H Concrete Trailer Pump Price

XCMG Hbds80 83m3 H Concrete Trailer Pump Price

CZPT HBDS80 83m3/H Concrete Trailer Pump Value

Solution description

HBT5008C-5S trailer pump has greatest output of fifty cubic meter per hour, equipped with self-analysis technological innovation checking the pump position at any time as effectively as diagnosing a lot more than fifty faults in real time. The 50 cubic meter trailer pump is able of decreasing the troubles taking pictures time by 70%, granting you equally time and peace of brain.

Lower Costs and Broad Adaptability

CZPT CZPT-conserving Tech

New-era power-preserving engineering and computerized changes of the motor and power primarily based on load helps make each drop of fuel create powerful energy, reducing twenty five% of vitality consumption.

Use Resisting Areas

Discharge port, put on plate and reducing ring, concrete piston and shipping cylinder adopt Sino-Germany large-tech supplies and superior technological innovation to greatly improve the product overall performance.

Wide Adaptability

Capable of working below any condition from -22°C to 55°C, working constantly for up to 12 several hours, can manage any fluid, pumping of hard concrete like B90, C150, and three-gradation concrete and even pump resources this sort of as silt, slag, squander resources, and mortar.

CZPT CZPT System

Pressure CZPTence Sensing & Reversing CZPT Program

With strain big difference sensing and reversing engineering, in addition to electro-hydraulic proportional buffering engineering, the pump is capable to filter impurities self-cyclically with an open up-variety technique, trying to keep the hydraulic oil thoroughly clean and cooled. This aids increase system performance, mitigate abrasion in between parts, therefore prolonging the pump’s services lifestyle and minimizing routine maintenance expenses.

CZPTally Retracted Double-piston

Only one particular button is essential to retract two concrete pistons into the h2o tank. This cuts the time for replacement and upkeep in 50 %, creating everyday upkeep more hassle-free.

Big-stream Large-effectiveness Principal Valve Method

The method adopts high-force, large-circulation, and electro-hydraulic precision control principal valve, as well as an integrated valve financial institution with an optimized runner design and style. The method is in a position to activity a quick reversing time, reduced force reduction, cooler temperatures, and large reliability for the consumer.

CZPT Management

Back-up Program

When the peripheral examination loop incurs faults for the duration of the design method, “Compulsory” pump procedure can be activated for emergency handling.

Improved Overall performance

Use a dedicated pumping motion controller that integrates a classic pumping algorithm and purpose libraries, ensuing in an enhanced arithmetic pace and total improved performance.

Successful Pump Method

A CZPTer, Much more Productive Style

Stress distinction sensing and reversing engineering, as nicely as main oil pump electrical proportional control buffering technologies to decrease reversing time. As such, pump is ready enhance the principal oil cylinder and swing cylinder buffering & reversing time matching, resulting in very substantial-efficiency pumping.

Potent Mixing Motor Handles Almost everything

Forced feeding by huge-displacement and large-torque steel ball motor. The motor mixes normally when there is an aggregate variation and the hopper is heightened, avoiding the mixing motor from obtaining stuck and bettering combination absorption functionality.

Large-bore Reversing Cylinder

Pumping system makes use of a massive-bore reversing cylinder to make reversing strong and completely steer clear of pipe blocking.

Improved Hopper, Enhanced Effectivity

The new hopper optimizes the hopper’s inner cavity to enhance the mixture absorbing efficiency, guard towards combination inapplicability, and simply handle high-problems concrete.

Parameter

Model HBT5008C-5S
Max. shipping force 8 Mpa
Max. concrete output  50 m3/h
Rated electricity 55kw
Delivery cylinder bore*stroke ∅180*1400 mm
Hopper capacity*Feeding peak .6*1240 m3/mm
Dimension(L*W*H) 5670*2045*2370 kg
Gross bodyweight 3950 kg
Max. combination size ∅150mm supply pipe 50 mm
Max. mixture measurement ∅125mm delivery pipe forty mm
Kind SS-Valve
Slum  of concrete a hundred~230 mm

 

XCMG Hbds80 83m3 H Concrete Trailer Pump Price